New Conveyor Installation at a Coal Fired Power Plant in Florida
Davis Industrial replaced the old conveyor system at a coal fired power plant in Lakeland, FL with four new conveyors. The old system was rusted and prone to frequent breakdowns, requiring expensive repairs and costly downtime. The new conveyor system is stainless steel with galvanized trough frames. Stevens Adamson components were used, including vibratory hoppers.